Section 2 - Perform the Monthly Patching Process

Section 2 - Perform the Monthly Patching Process

This section covers the simplified workflow for automated monthly patching. These few steps are all an admin needs to do on a monthly basis to ensure that all patches go through two stages of test deployments and one enterprise workstation deployment.

The key to this workflow is the elimination of the need to create new deployments each month with that month's patches. We simply modify the ruleset in the associated patch lists to include the newer patches, thus ensuring that every security patch that matches your ruleset going back to 2001 is deployed via one production deployment.

Once those patches install in Ring 1 and testing is complete, we make the same change to the date rule in the Patch List associated with Ring 2 group. Then finally, once we complete testing on Ring 2 endpoints, we make the same date change on the production patch list. These three changes each month enables movement through two rounds of testing before deploying in production.

This methodology can be expanded to meet whatever test framework an organization uses and enables exclusion of patches before the next stage begins. Any patches that need to be excluded, whether for performance issues, notifications from online services about patches causing issues, or a custom app that breaks during patch testing can easily be added to a global or targeted blocklist, thus ensuring those patches will not be installed in the next stage.

Note:

Note: For the sake of this runbook, assume the following patch scenario initiates on Patch Tuesday in February 2021 and this is the beginning of the monthly patch cycle. Also assume that two bad patches were identified during first stage of testing during the February 2021 patch cycle. This hypothetical scenario will allow us to walk through block listing as part of this workflow example.In your actual testing the February 2021 dates in this section should be replaced with the date of Patch Tuesday for the current month.

Verify Setup

  1. In the Patch workbench, select Deployments

  2. Select Installs

  3. Verify that it looks like the following screenshot. All three deployments should show all systems as Not Applicable.


  1. 1q

Deploy Patches to Ring 1

  1. In the Patch workbench, select Patch Lists

  2. Select Patch - Ring 1 Testing

  3. Select Edit

  4. On the rule named Patch Tuesday 2nd Tuesday, mouse over the rule and select the edit icon.

  5. Change the Rule Name and Expression to the current date that patches were released

    1. Rule Name= Patches Older than 2/9/2021

    2. Value= 2/9/2021


      2q
  6. Select Apply to save the rule.

  7. Select Show Preview to Continue

  8. Verify that patches with a Release Date older than or equal to 2/9/2021 display.

These are the patches that will deploy to the first test group if they are applicable. block listed patches will still appear in this list, but they will not download or install where Block Lists are applied. Since Block Lists can be deployed to any computer group, it is possible that different computers within this deployment may have different block listed patches.

  1. Select Update Patch List

  2. Return to the Deployments section and monitor the Patch - Ring 1 Testing

deployment until all applicable installs have a status of Complete or Not Applicable.

  1. Perform testing according to standard policies after patches complete installation.

Block List Bad Patches if Necessary

If testing identifies patches that should not be deployed in your environment, these patches can be added to the global block list prior to deployment to the next ring. This step is not required if no patches require block listing.

Note: In this scenario, KB4338818 and KB4338823 are selected for block listing. The steps below are examples of the process to add specific KB Articles to a block list. This method is preferable to manually selecting patches in the Block List as there are often multiple patches with the same KB number for different Operating System versions.

  1. In the Patch Workbench, select Block Lists

  2. Select Global Block List - Windows

  3. Select Edit

  4. Click Add Rule

    1. Rule Name= KB4338818

    2. Select Attribute = KB Articles

    3. Select Operator= Equals

    4. Value= KB4338818

    5. Select Apply

  5. Click Add Rule

    1. Rule Name= KB4338823

    2. Select Attribute = KB Articles

    3. Select Operator= Equals

    4. Value= KB4338818

    5. Select Apply

  6. Select Show preview to continue

  7. Verify the displayed patches meet the expected ruleset

  8. Select Update Block List


4q

Deploy Patches to Ring 2

  1. In the Patch workbench, select Patch Lists

  2. Select Patch - Ring 2 Testing

  3. Select Edit

  4. On the rule named Patch Tuesday 2nd Tuesday, mouse over the rule and select the edit icon.

  5. Change the Rule Name and Expression to the current date that patches were released

    1. Rule Name= Patches Older than 2/9/2021

    2. Value= 2/9/2021

  6. Select Apply to save the rule.

  7. Select Show Preview to Continue

  8. Verify that patches with a Release Date older than or equal to 2/9/2021 display.

  9. Select Update Patch List

  10. Return to the Deployments section and monitor the Patch - Ring 2 Testing

deployment until all applicable installs have a status of Complete or Not Applicable.

  1. Perform testing according to standard policies after patches complete installation.

  2. Optionally add any bad patches to a block list before production deployment

Deploy Patches to All Production Workstations

  1. In the Patch workbench, select Patch Lists

Select Patch - Ring 3 Production Workstations

  1. Select Edit

  2. On the rule named Patch Tuesday 2nd Tuesday, mouse over the rule and select the edit icon.

  3. Change the Rule Name and Expression to the current date that patches were released

    1. Rule Name= Patches Older than 2/9/2021

    2. Value= 2/9/2021

  4. Select Apply to save the rule.

  5. Select Show Preview to Continue

  6. Verify that patches with a Release Date older than or equal to 2/9/2021 display.

  7. Select Update Patch List

  8. Return to the Deployments section and monitor the Patch - Ring 3 Production Workstations deployment until all applicable installs have a status of Complete or Not Applicable.

  9. Perform testing according to standard policies after patches complete installation.