Configuring Patch Zero Touch Automation with Deployment Automation
Overview
Tanium Patch offers various levels of patch automation which can be used to build predictable, reliable, and verifiable patching for your organization. Automation makes organizations efficient, reduces the chance of human error, and frees up skilled administrators to focus on higher-value initiatives. In addition, faster and more complete installation of new security patches translates to a better overall security posture.
Tanium Patch zero touch automation accomplishes four primary goals:
-
Increase security patch coverage
-
Reduce time to install security patches
-
Reduce monthly labor hours for patch management
-
Reduce risk with phased deployments
This runbook is designed to guide you through setting up zero touch patch automation for your endpoints using Patch Deployment Automation. Keep in mind that patch automation is a journey and not all endpoints can have the same level of automation.
Tanium Patch Automation Overview
When you configure Tanium Patch automation, your endpoints automatically download approved security updates and install them during their assigned maintenance windows. The Patch Automatic Deployment Configuration (ADC) evaluates your approved patch criteria on a recurring schedule and creates new deployments automatically - you define the rules once. Patches are deployed in phases across your endpoints.
How Zero Touch Automation Works
Tanium Patch automation combines these key components:
|
Component |
Purpose |
|---|---|
|
Maintenance Windows |
Well-defined maintenance windows ensure patches are installed and endpoints are restarted at the proper time. |
|
Deployment Plans |
Define the ring sequence (Custom or Dynamic), the endpoints targeted in each ring, and the progression criteria (wait time, execution success rate, minimum endpoints) that must be met before a deployment advances to the next ring. |
|
Patch Automatic Deployment Configurations (Patch ADC) |
Define the patch criteria (rules) and patching cadence once. Patch automatically maintains the matching patch list and creates new deployments on schedule, applying the assigned Deployment Plan to each new deployment. |
|
Patch Lists |
Automatically created and versioned by the Patch ADC based on your Patch Criteria rules. |
|
Block Lists |
Rules-based approach to block patches determined to negatively impact endpoints. |
This runbook uses a four-ring deployment plan so that patches can be validated progressively before reaching your full endpoint population. Each ring is defined as part of a Deployment Plan.
Prerequisites
-
Tanium Patch version that supports Patch Deployment Automation (Tanium Cloud only)
-
Endpoint Toolset 2.32 or newer on target endpoints (required for automatic deployments)
-
End-User Notifications deployed to endpoints (for deployment notifications)
-
A user role with the Patch Automatic Deployment Configuration Operator permission
-
A user role with Deployment Plan read, Progression Criteria Set read, and Ring Set read permissions for the relevant content set
Step 1: Create Deployment Plans (Ring Sequences)
A Deployment Plan defines the ring sequence, the endpoints targeted in each ring, and the progression criteria that gate advancement between rings. Patch supports two ways to assign endpoints to rings:
-
Dynamic - each ring receives a percentage of the total targeted population and Patch automatically calculates and maintains ring membership. This requires no additional group maintenance, making it the simpler approach.
-
Custom - each ring is assigned a specific Filter Group (this runbook uses Custom Tags) for explicit control over ring membership. This is useful when ring assignment should follow existing organizational structures or be controlled directly via tags.
This runbook builds two plans: Patch Rings - Dynamic (percentage-based) and Patch Rings - Tagged (using Custom Tags). Each plan also has an optional accelerated variant - Patch Rings - Dynamic Accelerated and Patch Rings - Tagged Accelerated - for zero-day/emergency situations where a rollout needs to complete quickly; an accelerated variant is assigned to the Patch ADC's Patching Schedule Override instead of the regular recurring cadence. Whichever base plan you use day-to-day, it is assigned to the Patch ADC in Step 5 for regular deployments. You can use either plan, or both, if different classes of endpoints (e.g., workstations vs. servers) call for different treatment.
Plan 1: Patch Rings - Dynamic (percentage-based ring sizing)
Dynamic plans assign each ring a percentage of the total targeted endpoint population and automatically calculate and maintain the ring membership. Each ring automatically includes the endpoints from previous rings, and the final ring targets the built-in All Targeted Computers group. Use dynamic deployment plans when building specifically targeted ring groups isn't required, or when you want ring sizing to automatically rebalance as your targeted population changes.
Create Patch Rings - Dynamic Deployment Plan
-
Go to Administration > Actions > Deployment Plans.
-
Click Create Plan and select Dynamic.
-
Configure the plan overview -
-
Name: Patch Rings - Dynamic
-
Description: Dynamic deployment plan for Patch rings
-
Content Set: Default (or desired content set)
-
Preferred for Deployment Type: Platform Action
-
-
Add four rings (see table below).
-
Click Add Ring
-
Enter the Name
-
Set Assigned Endpoints to the percentage of total targeted endpoints shown below
-
Set the Wait value.
Ring
Assigned Endpoints (% of total targeted)
Wait
Evaluate Criteria
Ring 1
1%
1 day
None (default)
Ring 2
15%
2 days
None (default)
Ring 3
30%
3 days
None (default)
Ring 4
50%
4 days
None (default)
All Targeted Computers
(remaining endpoints, automatic)
—
—
Note:Each ring's percentage is measured against the total targeted endpoint population, and each ring automatically includes the endpoints assigned to previous rings - you do not need to exclude earlier rings' endpoints yourself.
-
-
(Optional) Click Defer Endpoints and select the filter groups that should always deploy last.
-
Go to the Preview Deployment Plan section and verify the endpoint counts per ring.
-
Click Save.
Create Deployment Plan - Dynamic ring type, showing percentage-based Assigned Endpoints for a ring
Patch Rings - Dynamic saved plan, showing the percentage and endpoint count assigned to each ring
(Optional) Create an Accelerated Variant: Patch Rings - Dynamic Accelerated
For situations where a patch must roll out immediately - for example, an actively exploited zero-day vulnerability - clone this plan and compress the wait between rings to one hour each (or desired interval). The accelerated variant is assigned to the Patch ADC's Patching Schedule Override in Step 5 instead of the regular recurring cadence, so an urgent patch can complete its full four-ring rollout in about four hours.
-
From Administration > Actions > Deployment Plans, open Patch Rings - Dynamic and click Clone (or create a new Dynamic plan using the same percentages per ring).
-
Update the cloned plan's overview - Name: Patch Rings - Dynamic Accelerated; Description: Dynamic deployment plan for Patch rings to be completed in four hours in a zero-day situation.
-
For each of the four rings, change Wait to 1 hour. Leave Evaluate Criteria empty to match the base plan.
-
(Optional) Click Defer Endpoints and select the filter groups that should always deploy last.
-
Go to the Preview Deployment Plan section and confirm the endpoint counts per ring look correct.
-
Click Save.
Plan 2: Patch Rings - Tagged (filter groups using Custom Tags)
For Custom deployment plans, Filter Groups form the foundational building blocks. It is essential to properly define which endpoints belong to which ring and maintenance window. Clear, consistent naming makes the mapping between group, ring, and maintenance window simple to understand.
Ring-based groups
This runbook uses four rings. Ring 1 should be small - generally a few hundred endpoints or fewer, or around 1% of endpoints. Rings 2 and 3 progressively widen the population. Ring 4 covers the remaining bulk of production endpoints, with the platform's built-in All Targeted Computers ring (included automatically as the final ring of the Deployment Plan) as the final catch-all.
It is recommended to define separate deployment plans for workstations and servers.
Well-defined ring-based groups are useful beyond patch automation - reuse them for software changes, third-party updates, policy configurations, etc.
Ring groups can be defined explicitly, using existing organizational structures (naming schemes, Active Directory OUs/security groups, IP subnets), sensors, or Custom Tags. This runbook uses Custom Tags to assign rings explicitly for the Patch Rings - Tagged plan below (and its optional accelerated variant).
Create Computer Groups with Custom Tags
Each Filter value below (e.g., "Custom Tags matches PatchRing1") can be typed or pasted directly into the Filter Bar tab under Members - Tanium parses the sensor, operator, and value automatically, so there is no need to build it manually in Filter Builder.
-
Go to Administration > Permissions > Computer Groups.
-
Click New Computer Group.
-
Name: Patch - Ring 1.
-
Enable Filter: Enable; select Default Filter Groups (or desired content set).
-
Filter: Custom Tags matches PatchRing1.
-
Click Save.
-
-
Click New Computer Group.
-
Name: Patch - Ring 2.
-
Enable Filter: Enable; select Default Filter Groups (or desired content set).
-
Filter: Custom Tags matches PatchRing2.
-
Click Save.
-
-
Click New Computer Group.
-
Name: Patch - Ring 3.
-
Enable Filter: Enable; select Default Filter Groups (or desired content set).
-
Filter: Custom Tags matches PatchRing3.
-
Click Save.
-
-
Click New Computer Group.
-
Name: Patch - Ring 4.
-
Enable Filter: Enable; select Default Filter Groups (or desired content set).
-
Filter: Custom Tags matches PatchRing4.
-
Click Save.
-
-
Click New Computer Group.
-
Name: Patch - All Rings.
-
Enable Filter: Enable; select Default Filter Groups (or desired content set).
-
Filter: Custom Tags starts with PatchRing.
-
Click Save.
-
This group represents the entire population the ADC should manage and is used later as the Patch ADC's targeted scope. Alternatively, you can use an existing computer group such as All Windows Workstations.
Create Computer Group - Name and Enable Filter settings for Patch - Ring 1
Computer Groups list filtered by “ring” - the five ring-based groups created above (Patch - All Rings, Patch - Ring 1–4), each with its Custom Tags filter expression
Deploy the custom tags to endpoints to opt them into the appropriate ring. For more information on applying custom tags, refer to “How to Effectively Use Custom Tags in the Tanium Platform.”
These same groups are used as the Filter Groups for the Patch Rings - Tagged plan below (and its optional accelerated variant).
Building the Patch Rings - Tagged Deployment Plan
-
Go to Administration > Actions > Deployment Plans.
-
Click Create Plan and select Custom (targets endpoints by filter group membership, matching the tag-based groups created above).
-
Configure the plan overview:
-
Name: Patch Rings - Tagged
-
Description: Deployment plan for Patch rings (tag-based)
-
Content Set: Default (or desired content set)
-
Preferred for Deployment Type: Platform Action
-
-
Add four rings, plus the platform's non-editable All Targeted Computers final ring (see table below).
|
Ring |
Assigned Endpoints (Filter Group) |
Wait |
Evaluate Criteria |
|---|---|---|---|
|
Ring 1 |
Patch - Ring 1 |
1 day |
None (default) |
|
Ring 2 |
Patch - Ring 2 |
2 days |
None (default) |
|
Ring 3 |
Patch - Ring 3 |
3 days |
None (default) |
|
Ring 4 |
Patch - Ring 4 |
4 days |
None (default) |
|
All Targeted Computers |
(remaining endpoints, automatic) |
— |
— |
No evaluation criteria is applied by default in this configuration - each ring simply progresses once its Wait period passes. If you want an added confidence gate before a ring advances, use Add under Evaluate Criteria to apply Execution Success Rate and/or Minimum Endpoints.
Use Defer Endpoints to ensure one or more filter groups are always deployed last, regardless of ring assignment - useful for endpoints that need extra lead time or special coordination before patching, such as VIP/executive systems, digital signage, or manufacturing or medical devices.
-
For each ring, click Add Ring, enter the Name, click Select Filter Groups under Assigned Endpoints and choose the matching ring group created above, then set the Wait value from the table above. Leave Evaluate Criteria empty unless you want an added gate.
-
(Optional) Click Defer Endpoints and select the filter groups that should always deploy last.
-
Go to the Preview Deployment Plan section and confirm the endpoint counts per ring look correct.
-
Click Save.
Patch Rings - Tagged deployment plan overview (4 rings + All Targeted Computers)
(Optional) Create an Accelerated Variant: Patch Rings - Tagged Accelerated
For situations where a patch must roll out immediately - for example, an actively exploited zero-day vulnerability - clone Patch Rings - Tagged and compress the wait between rings to one hour each. The accelerated variant is assigned to the Patch ADC's Patching Schedule Override in Step 5 instead of the regular recurring cadence, so an urgent patch can complete its full four-ring rollout in about four hours.
-
From Administration > Actions > Deployment Plans, open Patch Rings - Tagged and click Clone (or create a new Custom plan and select the same filter groups per ring).
-
Update the cloned plan's overview - Name: Patch Rings - Tagged Accelerated; Description: Deployment plan for Patch rings to be completed in four hours in a zero-day situation.
-
For each of the four rings, change Wait to 1 hour. Leave Evaluate Criteria empty to match the base plan (or add criteria if you still want a gate during an accelerated rollout).
-
(Optional) Click Defer Endpoints and select the filter groups that should always deploy last.
-
Go to the Preview Deployment Plan section and confirm the endpoint counts per ring look correct.
-
Click Save.
Patch Rings - Tagged Accelerated deployment plan overview (4 rings, 1-hour wait each)
Step 2: Create and Enforce Maintenance Windows
Maintenance Windows specify when endpoints are allowed to patch and reboot. If an endpoint has no Maintenance Window assigned, it can patch any time there is an active deployment. Use the built-in maintenance windows, [Blocking Maintenance Window] - Windows, to ensure systems only patch during a configured, active window. Verify these are enforced on All Windows.
Configure maintenance windows with the appropriate schedules and enforce them on the targeted computer groups. Ensure maintenance windows fall within the appropriate ring - for example, if Ring 3 endpoints should install patches roughly 7 days after release, the maintenance window should open after that point and before the Ring 4 threshold. Set Recurrence to Monthly, then under “Repeat Basis Based on Selected Effective Date” choose “Day of the week” so the window recalculates relative to the selected weekday (e.g., the second Tuesday) each month - this is how to align windows with Patch Tuesday.
Use endpoint local time for maintenance window time zones so endpoints install patches in their own time zone and adjust automatically for daylight-saving time changes.
Workstations generally benefit from a broad Maintenance Window to ensure patches are applied; use End User Notifications to give end users control over reboot timing.
Maintenance Window configuration example
Step 3: Verify the Global Block List
Block Lists specify patches that should not be deployed in the environment. Block Lists can contain individual patches or patches based on rules. This runbook uses the built-in [Global Block List] - Windows block list to hold any patches determined to negatively affect your endpoints.
-
Go to Modules > Patch > Block Lists.
-
Confirm [Global Block List] - Windows exists and is enforced on Patch Supported Systems. By default, this list excludes Security Only updates.
Block Patches with Known Issues
The phased approach in this runbook lets your organization respond quickly if a patch negatively impacts endpoints - ideally identified in Ring 1 or Ring 2 before it reaches the wider population.
-
Go to Modules > Patch > Block Lists.
-
Select [Global Block List] - Windows and click Edit.
-
Click Add Rule. Rule Name: KB5034441 (example). Conditions: KB Articles equals KB5034441. Click the blue check mark to apply.
-
Click Show Preview to Continue, then Update Block List.
Add contextual information to your block list rule names so it's clear why a patch was blocked, e.g. “KB5034441 - 2023-01 - CBS_E_INSUFFICIENT_DISK_SPACE Error on Small WinRE partition.”
Block List rule example
Step 4: Create a Deployment Template
Configure a Patch deployment template with the common install settings and end-user restart notification. You can create different templates for Windows servers vs. workstations, or Windows vs. Linux.
-
Go to Modules > Patch > Deployment Templates.
-
Click Create Deployment Template > Create Install Template.
-
Name: Zero Touch Patch Automation with Restart and Notification
-
Platform: Windows
-
Content Set: Patch Content Set
-
Deployment Frequency: Ongoing Deployment
-
Endpoint Local Time: Enabled
-
Download Immediately: Enabled
-
Distribute Over Time: Enabled, 2 Hours
-
Override Maintenance Windows: Disabled
-
Override Block Lists: Disabled
-
Restart: Enabled
-
Notify User: Enabled, Duration of Notification Period 8 hours (or desired value), Final Countdown to Deadline 15 minutes
-
Allow User to Postpone: Enabled (1 / 2 / 4 hours)
-
Title: Restart Required; Body: Please restart your computer to finish applying security updates.
-
-
Click Save.
Deployment Template settings
Step 5: Create the Patch Automatic Deployment Configuration (Patch ADC)
A Patch Automatic Deployment Configuration defines the patch criteria, cadence, targets, and assigned Deployment Plan. Patch automatically creates and manages the patch list(s) and every recurring deployment. The screenshots below are from a working example configuration, Patch Rings - Windows Workstations.
-
Go to Modules > Patch > Deployment Automation > Automatic Deployment Configurations and click Create Automatic Deployment Configuration.
-
Complete Deployment Parameters:
-
Name: Patch Rings - Windows Workstations (or similar)
-
Content Set: Patch Content Set
-
Deployment Template: Zero Touch Patch Automation with Restart and Notification (from Step 4)
-
-
In Targets, select Computer Groups and choose your broad endpoint population, e.g. All Windows Workstations, or Patch – All Rings.
-
Review Advanced Deployment Options to confirm they meet your needs from your deployment template:
Deployment Parameters, Targets, and Advanced Deployment Options
-
In Patching Cadence:
-
Set Recur to every 1 Month
-
On a specific day of the week, 2nd Tuesday - i.e., Patch Tuesday.
-
Set Deployment Time Zone to your standard org time zone
-
Enable Distribute Over Time (2 hours or desired value).
-
-
In Deployment Plan, select Patch Rings - Tagged or Patch Rings - Dynamic (created in Step 1). Click Plan Details, or expand each ring in place, to confirm the Wait values and endpoint counts before saving.
Patching Cadence and Deployment Plan, collapsed view
Patching Cadence and Deployment Plan, expanded to show all 4 rings - note each ring shows “This ring has no evaluation criteria” since none was added
-
In User Notification, confirm settings are set according to your deployment template.
User Notification settings and live preview
Note:Manually verify that Notification Duration and Final Countdown Duration match your deployment template’s Duration of Notification Period and Final Countdown to Deadline values - these two fields may not automatically carry over from the template.
-
In Patch Criteria, add one rule per patch type you want this configuration to manage. This example uses five OR rules:
-
Critical Updates (Classification equals Critical Updates)
-
Security Updates (Classification equals Security Updates)
-
Service Packs (Classification contains Service Pack)
-
Cumulative Update for .NET Framework (Title contains “Cumulative Update for .NET Framework” AND Classification equals Updates)
-
Update Rollups (Classification equals Update Rollups)
Patch Criteria rules, OR'd together, including one AND-logic rule
-
-
(Optional) Configure Patching Schedule Override for urgent/critical patches
-
Enable Override
-
Override Criteria - Severity equals Critical
-
Schedule Content - Deploy all available patches
-
Deployment Plan - Patch Rings - Tagged Accelerated (from Step 1)
-
When Override Criteria is met - Notify only (a human still approves the accelerated rollout rather than it firing automatically)
-
Deployment Schedule - Deploy immediately (applies once approved).
Patching Schedule Override, pointed at the Patch Rings - Tagged Accelerated plan
-
This example uses Notify only rather than Trigger deployment for the override. That means a critical patch surfaces a Needs Attention notification for a human to approve, instead of silently deploying itself - the accelerated 4-ring/1-hour plan is ready to go the moment someone clicks Deploy Now. If your organization wants the override to fire without human approval, select Trigger deployment > Deploy immediately instead.
Result
Patch creates the initial patch list and deployment within about an hour of saving. At each scheduled recurrence, Patch automatically creates a new deployment if the patch list has changed, and progresses it through the four rings of your Deployment Plan.
Results of configuring the Patch Automatic Deployment.
Step 6: Managed Patch Lists and Compliance Reporting
When you save a Patch ADC, Patch automatically creates and maintains a Tanium Managed patch list that matches its Patch Criteria - you never edit this patch list by hand. If the ADC has Patching Schedule Override enabled, a second Tanium Managed patch list is created for the override criteria (named Override - <ADC Name>). On the Patch Lists page, the associated Patch ADC patch lists are marked as Tanium Managed.
Patch Lists page showing the two Tanium Managed patch lists created by a single Patch ADC
You can build patch compliance reporting and dashboards the same way you would for any patch list. Follow Tanium's Patch Compliance Reporting and Dashboards article to create a Patch List Compliance report. See Patch Compliance Reporting and Dashboards.
If you're reporting across all four rings of a Deployment Plan, you don't need a separate report per ring - the managed patch list already represents the whole ADC. Build one compliance report/dashboard per ADC (and, optionally, one more for its override patch list) rather than one per ring.
Step 7: Review Automatic Deployment Activity
-
Go to Modules > Patch > Deployment Automation > Activity to review the All Activity table (Name, Configuration, Patches, Type, Status).
-
Select the Needs Attention tab to review and act on: Override Available - click Deploy Now to push patches that met override criteria (if configured for notify-only); No Deployment Plan - reassign a valid Deployment Plan if the original was deleted; Ring Deployment Issue - a ring cannot progress because progression criteria haven't been met, review and manually advance if appropriate.
-
To respond to an urgent situation, you can skip the wait interval for a specific ring: open the deployment from Modules > Patch > Deployments, go to the Deployment Plan section, select the ring, and click Skip (pending wait) or Skip the Wait (in-progress wait).
Deployment Automation Activity table
Needs Attention tab
Step 8: Ongoing Management
Tanium Patch provides the administrator with human in the loop control such as editing, pausing, resuming, and deleting the deployment automation.
-
Modules > Patch > Deployment Automation > Automatic Deployment Configurations
-
Edit: Modify existing Automatic Deployment Configurations.
-
Pause/Resume: Use Pause to stop new automatic deployments temporarily (active deployments continue); use Resume to pick back up.
-
Delete
Deployment Automation screen with a completed configuration where you can make changes.
-
Atlas Prompts (AI-Assisted Build)
Atlas Prompt - Built-In Patch Tuesday Prompt (Quick Start)
Last validated: 2026-08-14
Atlas includes a built-in prompt for patch deployment automation. This is the fastest way to get started with deployment automation.
-
Go to Atlas and click New Page.
-
Under the prompt text box, select Endpoint Management.
-
Select Automate my end-to-end Patch Tuesday response. Atlas fills in the prompt automatically.
-
Edit the prompt to specify Dynamic or Tagged rings (see Step 1), along with any other patching policy options your environment requires.
-
Submit the prompt. Atlas proposes each configuration for review - approve or modify each one before it saves.
Atlas New Page - the “Automate my end-to-end Patch Tuesday response” suggested prompt under Endpoint Management.