Deploy Software With Atlas
A Tanium operator deploys software with Tanium Atlas by describing the work in natural language, reviewing Atlas's proposed deployment configuration in the approval surface, and approving the action to run through the Tanium Deploy solution. Atlas drives software deployment well for specific, named-package deployments to a defined set of endpoints with operator review at each step. For multi-step orchestrations — OS upgrades, fleet-wide rollouts, or change-managed deployments with ring-based progression — Atlas authors an Automate playbook rather than executing the steps directly. The playbook is the durable, verifiable, audit-friendly artifact for those cases.
Use this article when you want to deploy a known software package — an application update, a line-of-business app, a remediation package — through Atlas.
Overview
In the classic Tanium Console, deploying software typically means opening the Deploy solution, selecting the package from the software gallery, defining the target computer group, configuring the deployment template (maintenance window, ring assignment, retry behavior), and submitting the action. Operators with deeper deployment needs build Automate playbooks that orchestrate multi-step deployments with pre-checks, soak periods, verification, and rollback paths.
In Atlas, you describe the deployment in plain language on an Atlas page. Atlas identifies the package, scopes the endpoints, proposes the action configuration, and surfaces the proposal in the approval surface for your review before it runs. The same Deploy solution, software gallery, deployment templates, and RBAC apply — Atlas does not bypass them. What changes is the assembly: you describe the work once, and Atlas constructs the configuration rather than you assembling it from the workbench.
Prerequisites
To deploy software through Atlas, you need:
-
A user account assigned the role that grants Atlas access.
-
A user account with the Tanium Deploy permissions appropriate to your role — at minimum deploy package read and the relevant deployment-creation privileges. Atlas does not bypass Deploy RBAC. A user who cannot deploy a particular package through the Deploy workbench cannot deploy it through Atlas either.
-
The Deploy module installed and configured in your environment, with the relevant packages available in your software gallery.
-
Configured Deploy templates that match your operational practice — maintenance windows, ring assignments, retry behavior. Atlas inherits these when proposing actions.
Find the affected endpoints
Before asking Atlas to deploy anything, ask Atlas to identify the endpoints that need the deployment. Two prompt patterns work well:
-
Which endpoints are running Microsoft Edge older than version 137? -
Show me endpoints in computer group "Engineering Workstations" that don't have [package name] installed.
The response surfaces the target endpoints — counts, computer names, current versions — and gives you a chance to refine the target set before any action is proposed. If the count is much larger than you expected, refine the question before moving on.
Atlas's first response on a Deploy-related prompt can take longer than other query types — typically up to a minute — because Atlas discovers Deploy solution functionality through its route surface rather than a pre-loaded workbench model.
Propose the deployment
Name the specific package and the specific target group. For example:
-
Propose a deployment of Microsoft Edge 137 to the 12 endpoints identified above. Do not execute it yet — I want to review the proposal first. -
Set up a deployment of [specific package name] to computer group "Engineering Workstations - Ring 1" using the standard maintenance window.
Name the package explicitly and name the target explicitly. Atlas's package selection from generic prompts — for example, deploy a browser update — can result in the wrong package being selected. Naming the package and the target removes this category of ambiguity.
Review the proposal before approving
When Atlas proposes the action, the approval surface shows:
-
The package Atlas selected, including the version. Confirm this is the package you intended.
-
The target endpoint list, expandable to individual computer names. Confirm the count and membership match what you asked for.
-
The inherited deployment template — maintenance window, ring assignment, retry behavior — pulled from your Deploy module configuration. Confirm it matches your operational practice.
-
A risk assessment summarizing the deployment's potential impact. Treat it as one input to your decision, not the only one.
-
The reasoning Atlas used to arrive at this configuration, including the queries it ran and the inputs it considered.
Do not approve a deployment without reading all of these. If the target list is larger than the affected endpoints you identified in the previous step, treat that mismatch as a signal that something is wrong with the configuration — not as a signal to approve and move on.
Run a pilot on a single endpoint or small ring
For any deployment that affects more than a handful of endpoints, run it against a single test endpoint or a small Ring 0 first. Ask Atlas:
-
Run this deployment against just [test endpoint name] first. After it completes, I'll decide whether to expand the target.
Atlas deploys to the single target, waits for completion, and reports the outcome. If the deployment succeeds and the endpoint behaves as expected, you can ask Atlas to expand to the broader target. If it fails or produces unexpected behavior, you have one endpoint to recover, not one hundred.
The single-endpoint pilot is non-negotiable for any state-changing deployment that touches an unfamiliar target set, package, or configuration.
Verify and expand
After the pilot succeeds, ask Atlas to verify the result and expand the deployment. For example:
-
Confirm the deployment succeeded on the test endpoint, then deploy to the remaining 11 endpoints in the target group. -
Re-query the version status on the test endpoint and confirm Edge 137 is now installed.
Atlas re-runs the query against the test endpoint and confirms the new state, then proceeds with the broader rollout. The page accumulates the proposal, the approval, the pilot result, the verification, and the broader rollout as a single record of the deployment — useful for incident review, audit, and shift handoff.
When to use an Automate playbook
For deployments that meet any of the following criteria, ask Atlas to author an Automate playbook rather than execute the deployment directly:
-
The deployment is multi-step — pre-check, deploy prerequisite, wait, verify, deploy main package, verify. Multi-step orchestrations are durable in Automate; a single Atlas conversation does not maintain state across those steps.
-
The target is the full fleet or a large fraction of it. Anything over a few hundred endpoints is better served by a ring-based playbook with verification gates between rings than a single Atlas-initiated action.
-
The deployment must respect change-control requirements — multiple approvers, an external approval system, recorded audit beyond the Atlas page. Automate playbook execution carries native audit that meets this requirement.
-
The deployment is part of a longer-running campaign — staged across maintenance windows over weeks, or driven by detection of an online state on previously offline endpoints. Automate playbook triggers are the right primitive for condition-driven execution.
The right prompt for this case: Author an Automate playbook that [describes the multi-step or large-scale deployment]. Don't execute it yet — I want to review the playbook before scheduling it. Atlas writes the playbook with the appropriate steps and surfaces it for your review. You then schedule the playbook through the Automate workbench, where it runs durably with verification gates in place.
A specific example of this pattern is an in-place Windows 10 to Windows 11 upgrade. The workflow involves pre-upgrade validation, package staging, the upgrade execution, and post-upgrade verification — Atlas does not maintain durable state across those steps in a single conversation. The recommended pattern is to ask Atlas to author an Automate playbook for the upgrade, review the playbook structure, and run the upgrade as a playbook. The playbook holds the multi-step state; Atlas is the front door, not the executor.